When is the EUF required to be paid? PDF Print E-mail

The EUF is to be paid upon application of Discharge Permit.

The Discharge Permit is legal authorization granted by LLDA to discharge liquid waste or wastewater of  specified concentration and volume into the sewer or any water body that directly or eventually drains into the Laguna de Bay for  the specified period of time.